Phase 1: Professional Planning
  • Meet with architect:
         16 hours of conceptual planning
         Working drawings included
  • Engineering:
         Site plan and Structural Engineering
         Engineered roof trusses included
  • Interior Decorator:
         16 hours included
Phase 2: Site Preparation
  • Soil Testing / Investigation
         Soil borings
         Surface samples
  • Tree and Topographical Survey
  • Silt Screens around the home site
  • Home marked off on site
Phase 3: Construction of Home Begins
  • Footers are poured
  • Stem Wall Erected
  • Back Fill Foundation
  • Under Ground Trades
Phase 4: Masonry
  • Prepare and Pour Slab
  • Erect Block Walls
  • Pour Block Walls with Concrete
Phase 5: Framing
  • Install Load Bearing Walls
  • Install Floor and Roof Trusses
  • Frame interior walls
  • Frame Architectural Details
  • Windows
  • Exterior Doors
Phase 6: Trades
  • Mechanical
         Heating
         Venting
         Air Conditioning
  • Plumbing
  • Electrical
  • Low Voltage
         Security Systems
         Phone / Cable
         Structured Wiring
         Central Vacuum
Phase 7: Dry Wall and Rough Paint

Phase 8: Interior Finishes
  • Solid Surface Flooring
         Marble
         Tile
         Wood
  • Cabinets
  • Counter Tops
  • Shower Tile/Marble
  • Trim
Phase 9: Trades Trim Out
  • HVAC Vents
  • Plumbing Fixtures Installed
  • Electric Fixture
         Plugs
         Switches
         Light Fixtures
         Ceiling Fans
Phase 10: Interior Completion
  • Final Paint
  • Carpet
  • Final Clean
  • Window Screens
Phase 11: Final Details
  • All Components are Complete
  • Final Inspections
Phase 12: Your New Home is Ready
  • Your New Home is Professionally Cleaned
  • Ready for Delivery
  • Congratulation on your New GEC Custom Home