Phase 1: Professional Planning
- Meet with architect:
16 hours of conceptual planning
Working drawings included
- Engineering:
Site plan and Structural Engineering
Engineered roof trusses included
- Interior Decorator:
16 hours included
Phase 2: Site Preparation
- Soil Testing / Investigation
Soil borings
Surface samples
- Tree and Topographical Survey
- Silt Screens around the home site
- Home marked off on site
Phase 3: Construction of Home Begins
- Footers are poured
- Stem Wall Erected
- Back Fill Foundation
- Under Ground Trades
Phase 4: Masonry
- Prepare and Pour Slab
- Erect Block Walls
- Pour Block Walls with Concrete
Phase 5: Framing
- Install Load Bearing Walls
- Install Floor and Roof Trusses
- Frame interior walls
- Frame Architectural Details
- Windows
- Exterior Doors
Phase 6: Trades
- Mechanical
Heating
Venting
Air Conditioning
- Plumbing
- Electrical
- Low Voltage
Security Systems
Phone / Cable
Structured Wiring
Central Vacuum
Phase 7: Dry Wall and Rough Paint
Phase 8: Interior Finishes
- Solid Surface Flooring
Marble
Tile
Wood
- Cabinets
- Counter Tops
- Shower Tile/Marble
- Trim
Phase 9: Trades Trim Out
- HVAC Vents
- Plumbing Fixtures Installed
- Electric Fixture
Plugs
Switches
Light Fixtures
Ceiling Fans
Phase 10: Interior Completion
- Final Paint
- Carpet
- Final Clean
- Window Screens
Phase 11: Final Details
- All Components are Complete
- Final Inspections
Phase 12: Your New Home is Ready
- Your New Home is Professionally Cleaned
- Ready for Delivery
- Congratulation on your New GEC Custom Home
|
|